Introduction of 2 (Two) Set of Low Height continuous Miner (LHCM) Package for winning coal without blasting from the district(s) in Shivani UG Mine of Bhatgaon Area of SECL.
Supply, erection, testing and commissioning of 132 KV D/C line from existing 02(two) phase to 03(three) phase line from 132/33 KV Konar sub-station for power supply to Hazaribagh Road Railway TSS, Hazaribagh
CONSTRUCTION OF FLYOVER AT GORIPALAYAM JUNCTION IN MADURAI CITY FROM 440/100-441/0 OF VARANASI – KANYAKUMARI ROAD (SHU-73) INCLUDING ADDITIONAL ARM TOWARDS PALAM STATION ROAD AND KM 0/0-0/6 OF MADURAI – ALAGARKOIL – MELUR ROAD (SH72A) WITH ATGRADE IMPROVEMENTS INCLUDING JUNCTION IMPROVEMENTS IN 5 LOCATIONS (ANNA STATUE, GORIPALAYAM, YANAIKKAL, BIBIKULAM, TALLAKULAM) AND VEHICULAR UNDERPASS (VUP) AT KM 0/4 OF SH72A