Flood Control and Flood Management for Management for Tuparihalla phase-II upto Confluence of Bennihalla from Km 0.000 to Km90.00”. (WI NO:- KNNL/2024-25/FP/WORK_INDENT2891)
“Investigation, Design, Supply, Installation, Testing and Commissioning of Lift & Gravity System- Consisting of Pressure main and Gravity main, including Distribution Network for filling of 13 Tanks from RM/DC and also rejuvenation of existing tanks, formation of new tanks, Beautification of tanks, construction of approach road and linking roads including cross drainage works to connect the tanks under Satge-2 works (In continuation of Arabhavi Tank Filling Scheme Stage-1 work) on Lump sum Turnkey Basis”.(Indent No 2583) from the registered / Valid KPWD Class-I contractor.
SHIRUR LIFT IRRIGATION SCHEME Stage 2- Providing of Raising Main &Bleeder pipe (Design,supply, erection, testing and commissioning) including allied works etc.
ANWAL LIFT IRRIGATION SCHEME Stage 2- Providing of Raising Main pipe (Design, Supply, erection, testing and commissioning) including allied works such as anchor blocks, thrust blocks, structures for crossings, necessary valves, surge protection works, railway crossing and delivery chamber at Ch:148+800of Ghataprabha Right Bank Canal in Badami taluk of Bagalkote district including Operation and Maintenance for a period of 5 years after successful completion of work ANWAL LIFT IRRIGATION SCHEME Stage-2 on Turn-Key Basis." (Indent No. KNNL/2024-25/LIWORK_INDENT1122/CALL-2)