INSTALLATION OF 16 NOS.10 KLD PACKAGE TYPE SEWAGE TRETMENT PLANT(MBBR TECHNOLOGY BASED)WITHIN POWER PLANT AREA OF MEJIA THERMAL POWER STATION ON EPC BASIS.
CONDUCTING DETAILED TOPOGRAPHICAL, PREPARATION OF DESIGNS, DRAWINGS AND CONSTRUCTION OF DISTRIBUTARY CANAL NETWORK COMPRISING OF MINORS,SUB-MINORS, LATERIALS AND SUB-LATERALS INCLUDING LINING AND STRUCTURES ETC.