Supply, Installation and Commissioning of “100 Mbps and 50 Mbps” dedicated symmetric internet bandwidth connectivity through leased line with assured bandwidth of “100 and 50 Mbps” Worldwide with 1:1 full duplex for three years".
ESSO-National Institute of Ocean Technology,
Issue Date:12-12-2024
Closing Date:02-01-2025
Location:Chennai, Tamil Nadu
ITJ Volume:
ITJ Volume No:
ITJ Publication Date:
18-12-2024
Description:Supply, Installation and Commissioning of “100 Mbps and 50 Mbps” dedicated symmetric internet bandwidth connectivity through leased line with assured bandwidth of “100 and 50 Mbps” Worldwide with 1:1 full duplex for three years".