SynCon package-SC04T for Establishment of 1 No. of Synchronous Condenser (SynCon) unit at 400kV level of 765/400/220kV Bikaner (Pugal) Sub-Station associated with “Intra-State Transmission System for Establishment of 765kV GSS Bikaner (Pugal) along with associated Transmission System” under TBCB route..
पावर ग्रिड कॉरपोरेशन ऑफ इण्डिया लिमिटेड /Power Grid Corporation of India Ltd.
Corrigendum-1 (Reply to pre-bid Queries & Corrigendum-1 for Selection of Bankers for Sanction of Term Loan for the newly launched BRAHMA Project at Umariya, Near Bhopal, Madhya Pradesh).
Extension of due date -(Dismantling of existing Transformers and the Design, Engineering, Erection, Civil Works, Testing, and Commissioning of 31.5 MVA, 132/34.5 kV Power Transformers (Make M/s ECE Industries Ltd.) on existing plinths each at Purulia substation, WB, Panchet.)
Extension of due date (Design, Engineering, Supply, Erection including Civil Works, Testing and Commissioning of 11kV Single Circuit line on 33kV Rail pole structure from Nehru Park (Loc. 4 of existing 11kV PHS- Panchet line) to ESD, Panchet, DVC. )