Survey, Investigation, Preparation of Design & Drawings, Installation, Testing and commissioning of Lift Headworks, Electrical Sub-Station. Transmission Line, Terminal Bay, Rising Main, Delivery Chamber and Construction of Pipe Distribution Network including Structures and SCADA Compatible Sluice valves, Butterfly valves, Flow Meters, etc.
KBJNL
Issue Date:08-04-2026
Closing Date:13-05-2026
Location:Raichur, Karnataka
ITJ Volume:
ITJ Volume No:
ITJ Publication Date:
08-04-2026
Description:Survey, Investigation, Preparation of Design & Drawings,
Installation, Testing and commissioning of Lift Headworks, Electrical Sub-Station.
Transmission Line, Terminal Bay, Rising Main, Delivery Chamber and Construction of Pipe
Distribution Network including Structures and SCADA Compatible Sluice valves, Butterfly
valves, Flow Meters, etc.