Supply, Delivery, Installation, Testing and Commissioning of flow meters with IOT based centralised SCADA system in existing sewage pumping stations and Sewage treatment plants of CMWSSB including Operation and Maintenance for the period of 3 years and one more.
Chennai Metropolitan Water Supply and Sewerage Board
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-04 Ch.121+200 to Ch.129+140 and Spur Road of 0.90 Km (Design Build)
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-03 Ch.113+350 to Ch.121+200 (Design Build)
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-02 Ch.107+100 to Ch.113+350 (Design Build)
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-01 Ch.101+800 to Ch.107+100 (Design Build)
"Lifting of 6.0 MMTPA of raw coal from M/s MCL mines, Talcher area, Transportation up to Washery, beneficiation, Washed coal transportation up to nearest Railway siding and loading in to Railway wagons” for a period of Two years, for onward movement by others to SDSTPS of APPDCL"