Flood Control and Flood Management for Management for Tuparihalla phase-II upto Confluence of Bennihalla from Km 0.000 to Km90.00”. (WI NO:- KNNL/2024-25/FP/WORK_INDENT2891)
“Investigation, Design, Supply, Installation, Testing and Commissioning of Lift & Gravity System- Consisting of Pressure main and Gravity main, including Distribution Network for filling of 13 Tanks from RM/DC and also rejuvenation of existing tanks, formation of new tanks, Beautification of tanks, construction of approach road and linking roads including cross drainage works to connect the tanks under Satge-2 works (In continuation of Arabhavi Tank Filling Scheme Stage-1 work) on Lump sum Turnkey Basis”.(Indent No 2583) from the registered / Valid KPWD Class-I contractor.
SHIRUR LIFT IRRIGATION SCHEME Stage 2- Providing of Raising Main &Bleeder pipe (Design,supply, erection, testing and commissioning) including allied works etc.