Work of “Survey, design, supply, fabrication, installation, testing and commissioning of debris boom barrier across the Dikrong River at Pare Hydro Power Station (2x 55 MW), Papum Pare, Arunachal Pradesh”.
Design, Supply, Installation, Testing and Commissioning of Solar Photo Voltaic (SPV) based 30 kWp grid interactive solar power plant at the Bank’s Main Office Building in Chandigarh