IMPLIMENTATION OF LIFT IRRIGATION SCHEME UNDER SIDDAPURA LIFT IRRIGATION SCHEME FOR PROVIDING IRRIGATION FACILITY TO 1200 HECTARES OF COMMAND AREA TO VILLAGES NEAR SIDDAPURA IN KUNDAPURA TALUKU UDUPI DISTRICT” including Survey, Investigation,
Supply, Installation, Testing & commissioning of 03 KL Bulk Milk Cooler on Annual Rate Contract (ARC) basis at different dairies of COMFED as per technical specification. ETC.
Comprehensive Operation and Maintenance of 400MW grid connected Solar PV power project at Talaricheruvu(V), Near Tadipatri, Anantapuramu District in Andhra Pradesh for Three (03) years i
“Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine pumps coupled to HT Motors, Power supply including terminal bay, 110 KV Electrical Sub Station, Transmission line, Rising Main and Delivery Chamber) for providing irrigation facility to 8390 Ha of command area in Chikodi taluka of Belagavi District by lifting water from Krishna River near Kallol village during Kharif season including Operation and Maintenance for a period of 5 years after successful completion of work KARAGAON LIFT IRRIGATION SCHEME on Turn-Key Basis” (PHASE-1 works).
Universal carbody Integration Jig: Design, Manufacture, Supply, Installation, Commissioning and Proving Universal Carbody Integration Jig for Broad gauge and Standard gauge coaches to suit Carbody assemblies of both Metro and Commuter rail train coaches.
Design, Supply and Labour job for installation, testing & commissioning of 30 MTPD Fully Powder Plant at Sitamarhi under Tirhut Dugdh Utpadak Sakhari Sangh Ltd., Muzaffarpur.