Design, Engineering, Manufacturing, testing at manufacturer’s works before dispatch, Supply, transportation, storage at site, insurance transit, storage cum erection testing & commissioning), erection, testing and commissioning of 5 Nos. i.e., 3 Nos 238/270MW and 2 Nos 118/135 MW capacity Vertical Francis Reversible Pump-Turbine and Synchronous Motor-Generator sets along with all associated auxiliary and ancillary equipment, 400KV Gas Insulated Switchgear, Pothead yard & Power evacuation Structures Civil works & Hydro Mechanical works of Kamalapadu Pumped Storage Hydro Electric Project on EPC (TURN KEY) basis at Kamalapadu Village, Yadiki Mandal, Ananthapuramu District, Andhra Pradesh.
ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED