Establishment of 132KV(GIS)/33KV(AIS) solar pooling station along with the construction of 132KV D/C LILO from BTPS-Konar-Barhi Line for evacuation of power from 228 MW Floating Solar (FSPV and 100MW/400MWH BESS at Konar..
SURVEY, DESIGN, SUPPLY, ERECTION, TESTING & COMMISSIONING WORKS FOR REPLACEMENT OF EXISTING ACSR LARK/PANTHER CONDUCTOR IN RESPECT OF 132KV D/C TRANSMISSION LINES OF DVC WITH HTLS(HIGH TEMPERATURE LOW SAG) CONDUCTOR.