Annual Manning and Operation on round the clock basis for 05(five) nos. Panel Operated Cabins, 06(Six) nos. Level Crossing Gates (existing), 04(four) nos. of additional new Level Crossing Gates after complete construction, 01(one) no. Central Railway Control Room and round the clock manning for OHE isolator operation work in the Captive Railway Network of Mejia Thermal Power Station, DVC.
Installation of FGD system at CTPS U#7&8(2X250 MW)” as per the Scope mentioned in VOLUME-II of this EOI documents following the terms & conditions of this EOI documents