Design, Engineering, Manufacturing, testing at manufacturer’s works before dispatch, Supply, transportation, storage at site, insurance transit, storage cum erection testing & commissioning), erection, testing and commissioning of 5 Nos. i.e., 3 Nos 238/270MW and 2 Nos 118/135 MW capacity Vertical Francis Reversible Pump-Turbine and Synchronous Motor-Generator sets along with all associated auxiliary and ancillary equipment, 400KV Gas Insulated Switchgear, Pothead yard & Power evacuation Structures Civil works & Hydro Mechanical works of Kamalapadu Pumped Storage Hydro Electric Project on EPC (TURN KEY) basis at Kamalapadu Village, Yadiki Mandal, Ananthapuramu District, Andhra Pradesh.
ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED
Dr.MVR RTPP – Stage.I - R&M of Ash Handling System, DM Plant, CW Pump House etc and Design, Engineering, Supply, Erection, Testing and commissioning of bottom discharge Dense Phase conveying system to ESP 1st, 2nd & 3rd fields for Units 1 & 2 of (2x2...
Dr.NTTPS-Supply of 3-phase auto controlled dimmerstat and step-up transformer along with control unit and all other corresponding equipments for conducting HV test(forward charging).
Transportation of 120.0 Lakh MT (60.0 Lakh MT per Annum) of raw coal from M/s Mahanadi coalfields Ltd. or washed coal from M/s ACB (India) Talcher Washery siding (SSMT) / any other washery sidings of MCL, Talcher or part quantity of both raw coal & washed coal to Dr.M.V.R.RTPP on “FOR” destination basis by Rail cum Sea cum Rail route via Paradip and Adani Krishnapatnam / Ennore ports for a period of 2 years.
"Lifting of 6.0 MMTPA of raw coal from M/s MCL mines, Talcher area, Transportation up to Washery, beneficiation, Washed coal transportation up to nearest Railway siding and loading in to Railway wagons” for a period of Two years, for onward movement by others to SDSTPS of APPDCL"