Package – IV: Synchronous condensers (SynCon) at Barmer II HVDC Terminal Station (SynCon unit-1 and SynCon unit-2) associated with Transmission System for evacuation of power from Rajasthan REZ Ph-IV (Part-5 :6 GW) [Barmer Complex] Barmer II: 6 GW (Solar) (LCC Configuration) through Tariff Based Competitive Bidding (TBCB) route.prior to RfP bid submission by POWERGRID to BPC.
“Design, Engineering, Manufacture, Programming, Inspection, Packing and Forwarding, Supply & delivery at site stores, dismantling of old systems and Erection, Testing & Commissioning of 04 Nos. Digital Automatic Voltage Regulator (DAVR) based Static Excitation System for 4X115 MW Units of Lower Sileru Power House, Polavaram District in Andhra Pradesh”.
ANDHRA PRADESH POWER GENERATION CORPORATION LIMITED
Design, Engineering, Manufacture, Programming, Inspection, Packing and Forwarding, Supply & delivery at site stores, dismantling of old systems and Erection, Testing & Commissioning of 04 Nos. Digital Automatic Voltage Regulator (DAVR) based Static Excitation System for 4X115 MW Units of Lower Sileru Power House, Polavaram District in Andhra Pradesh”.
(ONLINE MODE) for Interior, Furnishing, Electrical, and AC low side works in Central Bank of India’s MANDORE BRANCH DIST JODHPUR (THROUGH ONLINE BIDDING PROCESS).
व्यवसाय सहायता विभाग / Business Support Department,