Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-04 Ch.121+200 to Ch.129+140 and Spur Road of 0.90 Km (Design Build)
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-03 Ch.113+350 to Ch.121+200 (Design Build)
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-02 Ch.107+100 to Ch.113+350 (Design Build)
Formation of Chennai Peripheral Ring Road Section-V - Singaperumal Koil to Poonjeri - (JICA Phase 2) Package DB-01 Ch.101+800 to Ch.107+100 (Design Build)
"Lifting of 6.0 MMTPA of raw coal from M/s MCL mines, Talcher area, Transportation up to Washery, beneficiation, Washed coal transportation up to nearest Railway siding and loading in to Railway wagons” for a period of Two years, for onward movement by others to SDSTPS of APPDCL"